|
|
|
|
|
|
|
- Visual inspection, noting hose arrangement and condition of hoses and regulator housings.
- Intermediate and cracking pressures checked.
- Dismantle and clean all metal components in ultrasonic cleaner. They are then washed in hot water to neutralise the cleaning chemical, and dried and laid out for assembly or replacement.
- All plastic and non metallic parts are thoroughly washed and cleaned in warm water and a mild detergent. They are then dried, and laid out for assembly or replacement.
- All units are assembled with new “O” rings and any other parts that need replacement, using in moderation, the appropriate food grade silicon grease.
- The intermediate and cracking pressures are set to the manufacturer’s specification.
- A dry and a wet test are carried out, to ensure there are no leaks.
- The unit is then pressurised for a time, and is monitored to ensure that there is no IP creep.
- Finally, the regulator is tested in our on site pool.
- The service is now completed and guaranteed - the regulator is returned to the customer.
|
|
|
|
|
|
|
|
|
|
|